Kogaja well drilling project update
We have made enormous progress on our well drilling project in Kogaja.
The 15 foot water tower that will hold two 5,000 liter water tanks is close to completion! Last steps are applying plaster and paint and installing a four faucet water station.
We have constructed a well house and are having a transformer installed to power the submersible well pump that can pump 3,000 liters per hour of water and it will also be large enough to provide power for the future medical clinic and campus for 600 students that we envision.